Week eight of construction has seen a ton of changes: windows (hooray!), ductwork, pipes, a tub, etc... and what might be the beginnings of a walking path to the metro? We've also set a date for our pre-drywall inspection in about a week and a half.
The extra windows are in! (One extra in the master bedroom, and another in a secondary bedroom.) They may not look like much in this picture, but we love having all the natural light.
Windows are in.
Lots of ductwork has been installed.
Tub for the guest bath.
Meter boxes mounted by the garage.
The beginnings of a walking path to the metro, maybe?
Looking great...^_^